Aker Wayfarer SESV modification project - Load-out, transport and installation of 420ton Tower and 260ton Winch, 2016
Client: Kuehne + Nagel AS
- Transport Manual covering all aspects of the transportation from Rolls-Royce production site to installation onboard Aker Wayfarer vessel.
- Supercargo on site leading the operation